We stapled up 12 segments of PVC membrane and then welded the other 12 between them so the roof membrane is fixed down and watertight. The eaves fringe is 20cm to allow for the upstand and gutters to be fixed in.
So now two yeears fter we finished the floors and having been defrauded by our kit builder we have one 9m roundhouse up and watertight. Next job is to fix the eaves and geotextiles and lay the turfs which we cut this week
Saturday, 19 October 2013
Subscribe to:
Posts (Atom)