Wednesday 29 September 2010

shedfuls of windows



We were forced to stop concreting founds due to too much rain.................................. and sort out the shed as it will be needed or storing the windows very soon. Unlike almost all the Grand Designs builders whose windows arrive weeks or months after the shell of the building is up ours will be here several months before we can consider getting the kit up. It is now pretty much wrapped and battened. The door headroom is 2.1m windows on pallets are 2.25m so I am removing the top of the door frame to give us the necessary clearance. We can get a max of 2.31m. There is still the eaves overhang to worry about. Hope it works. We are apprehensive.

No comments:

Post a Comment